Is it possible to script All of the Log Shipping configuration?
For example: I need to write a job that initiates Log Shipping from two databases from server A to server B.
The job will run on Server A.
By the way both are SQL 2008 R2 Enterprise.
There's a share on server A. \serverA\Log
I Believe this is all that is needed. Is it possible to do it just by script? Do I have to initialize the databases or is there a option like SSMS to auto initialize?
Will I have to create the jobs manually? or is it configured in a way that creates the jobs and manages them?
Is it scriptable? Has anyone done anything like this? Does any one have a script to do this?
Thanks in advance.
This is totally possible, and it can be scripted out through the log shipping setup GUI. The only obstacle to overcome in the script that it generates will need to connect to both the primary and the secondary in the same script. This can be accomplished by used the SQLCMD mode commands of SQLCMD using the CONNECT command, making sure to put GOs between the connections. As a bonus you can also execute OS commands (copy, del, etc.) so you can script out the backup and restore as well. See example below.
-- Execute the following statements at the Primary to configure Log Shipping
-- for the database [primary\instance1].[mydb],
-- The script needs to be run at the Primary in the context of the [msdb] database.
-------------------------------------------------------------------------------------
-- Adding the Log Shipping configuration
-- ****** Begin: Script to be run at Primary: [primary\instance1] ******
:setvar PRIMARY primary\instance1
:setvar SECONDARY secondary\instance2
:setvar DATABASE mydb
:setvar PBKDIR "D:\Program Files\Microsoft SQL Server\MSSQL.1\MSSQL\BACKUP\"
:setvar PBKSHARE "\\primary\d$\Program Files\Microsoft SQL Server\MSSQL.1\MSSQL\BACKUP\"
:setvar SBKSHARE "\\secondary\d$\Program Files\Microsoft SQL Server\MSSQL.1\MSSQL\BACKUP\"
:setvar SDATADIR "D:\Program Files\Microsoft SQL Server\MSSQL.1\MSSQL\DATA\"
:connect $(PRIMARY)
alter database [$(DATABASE)] set recovery full
DECLARE @LS_BackupJobId AS uniqueidentifier
DECLARE @LS_PrimaryId AS uniqueidentifier
DECLARE @SP_Add_RetCode As int
EXEC @SP_Add_RetCode = master.dbo.sp_add_log_shipping_primary_database
@database = N'$(DATABASE)'
,@backup_directory = N'$(PBKDIR)'
,@backup_share = N'$(PBKSHARE)'
,@backup_job_name = N'LSBackup_$(DATABASE)'
,@backup_retention_period = 1440
,@backup_threshold = 180
,@threshold_alert_enabled = 1
,@history_retention_period = 5760
,@backup_job_id = @LS_BackupJobId OUTPUT
,@primary_id = @LS_PrimaryId OUTPUT
,@overwrite = 1
IF (@@ERROR = 0 AND @SP_Add_RetCode = 0)
BEGIN
DECLARE @LS_BackUpScheduleUID As uniqueidentifier
DECLARE @LS_BackUpScheduleID AS int
EXEC msdb.dbo.sp_add_schedule
@schedule_name =N'LSBackupSchedule_$(PRIMARY)'
,@enabled = 1
,@freq_type = 4
,@freq_interval = 1
,@freq_subday_type = 4
,@freq_subday_interval = 60
,@freq_recurrence_factor = 0
,@active_start_date = 20100101
,@active_end_date = 99991231
,@active_start_time = 0
,@active_end_time = 235900
,@schedule_uid = @LS_BackUpScheduleUID OUTPUT
,@schedule_id = @LS_BackUpScheduleID OUTPUT
EXEC msdb.dbo.sp_attach_schedule
@job_id = @LS_BackupJobId
,@schedule_id = @LS_BackUpScheduleID
EXEC msdb.dbo.sp_update_job
@job_id = @LS_BackupJobId
,@enabled = 1
END
EXEC master.dbo.sp_add_log_shipping_alert_job
EXEC master.dbo.sp_add_log_shipping_primary_secondary
@primary_database = N'$(DATABASE)'
,@secondary_server = N'$(SECONDARY)'
,@secondary_database = N'$(DATABASE)'
,@overwrite = 1
backup database [$(DATABASE)] to disk = '$(PBKDIR)$(DATABASE)_dr_init.bak' with init
go
print '$(PBKSHARE)$(DATABASE)_dr_init.bak'
print '$(SBKSHARE)'
print 'copy $(PBKSHARE)$(DATABASE)_dr_init.bak $(SBKSHARE) /y'
!!copy $(PBKSHARE)$(DATABASE)_dr_init.bak $(SBKSHARE) /y
go
!!del $(PBKSHARE)$(DATABASE)_dr_init.bak /Q
go
-- ****** End: Script to be run at Primary: [primary\instance1] ******
-- Execute the following statements at the Secondary to configure Log Shipping
-- for the database [secondary\instance2].[mydb],
-- the script needs to be run at the Secondary in the context of the [msdb] database.
-------------------------------------------------------------------------------------
-- Adding the Log Shipping configuration
-- ****** Begin: Script to be run at Secondary: [secondary\instance2] ******
:connect $(SECONDARY)
!!sqlcmd /E /S$(SECONDARY) -i DRRestoreDatabase.sql -v BKDIR="$(SBKSHARE)" -v DATADIR="$(SDATADIR)" -v LOGDIR="$(SLOGDIR)"
!!del $(SBKSHARE)$(DATABASE)_dr_init.bak /Q
go
DECLARE @LS_Secondary__CopyJobId AS uniqueidentifier
DECLARE @LS_Secondary__RestoreJobId AS uniqueidentifier
DECLARE @LS_Secondary__SecondaryId AS uniqueidentifier
DECLARE @LS_Add_RetCode As int
EXEC @LS_Add_RetCode = master.dbo.sp_add_log_shipping_secondary_primary
@primary_server = N'$(PRIMARY)'
,@primary_database = N'$(DATABASE)'
,@backup_source_directory = N'$(PBKSHARE)'
,@backup_destination_directory = N'$(SBKSHARE)'
,@copy_job_name = N'LSCopy_$(PRIMARY)_$(DATABASE)'
,@restore_job_name = N'LSRestore_$(PRIMARY)_$(DATABASE)'
,@file_retention_period = 1440
,@overwrite = 1
,@copy_job_id = @LS_Secondary__CopyJobId OUTPUT
,@restore_job_id = @LS_Secondary__RestoreJobId OUTPUT
,@secondary_id = @LS_Secondary__SecondaryId OUTPUT
IF (@@ERROR = 0 AND @LS_Add_RetCode = 0)
BEGIN
DECLARE @LS_SecondaryCopyJobScheduleUID As uniqueidentifier
DECLARE @LS_SecondaryCopyJobScheduleID AS int
EXEC msdb.dbo.sp_add_schedule
@schedule_name =N'DefaultCopyJobSchedule'
,@enabled = 1
,@freq_type = 4
,@freq_interval = 1
,@freq_subday_type = 4
,@freq_subday_interval = 60
,@freq_recurrence_factor = 0
,@active_start_date = 20090505
,@active_end_date = 99991231
,@active_start_time = 0
,@active_end_time = 235900
,@schedule_uid = @LS_SecondaryCopyJobScheduleUID OUTPUT
,@schedule_id = @LS_SecondaryCopyJobScheduleID OUTPUT
EXEC msdb.dbo.sp_attach_schedule
@job_id = @LS_Secondary__CopyJobId
,@schedule_id = @LS_SecondaryCopyJobScheduleID
DECLARE @LS_SecondaryRestoreJobScheduleUID As uniqueidentifier
DECLARE @LS_SecondaryRestoreJobScheduleID AS int
EXEC msdb.dbo.sp_add_schedule
@schedule_name =N'DefaultRestoreJobSchedule'
,@enabled = 1
,@freq_type = 4
,@freq_interval = 1
,@freq_subday_type = 4
,@freq_subday_interval = 60
,@freq_recurrence_factor = 0
,@active_start_date = 20090505
,@active_end_date = 99991231
,@active_start_time = 0
,@active_end_time = 235900
,@schedule_uid = @LS_SecondaryRestoreJobScheduleUID OUTPUT
,@schedule_id = @LS_SecondaryRestoreJobScheduleID OUTPUT
EXEC msdb.dbo.sp_attach_schedule
@job_id = @LS_Secondary__RestoreJobId
,@schedule_id = @LS_SecondaryRestoreJobScheduleID
END
DECLARE @LS_Add_RetCode2 As int
IF (@@ERROR = 0 AND @LS_Add_RetCode = 0)
BEGIN
EXEC @LS_Add_RetCode2 = master.dbo.sp_add_log_shipping_secondary_database
@secondary_database = N'$(DATABASE)'
,@primary_server = N'$(PRIMARY)'
,@primary_database = N'$(DATABASE)'
,@restore_delay = 0
,@restore_mode = 1
,@disconnect_users = 1
,@restore_threshold = 180
,@threshold_alert_enabled = 1
,@history_retention_period = 2880
,@overwrite = 1
END
IF (@@error = 0 AND @LS_Add_RetCode = 0)
BEGIN
EXEC msdb.dbo.sp_update_job
@job_id = @LS_Secondary__CopyJobId
,@enabled = 1
EXEC msdb.dbo.sp_update_job
@job_id = @LS_Secondary__RestoreJobId
,@enabled = 1
END
go
-- ****** End: Script to be run at Secondary: [secondary\instance2] ******